Turnkey construction of a 20 MW solar power plant in southern Sweden: site preparation, piling, structures, module installation, cabling and grid commissioning completed in three months.
Turnkey construction of a 36 MW solar power plant in Germany: adapted foundations, reinforced steel structures, cable routes and grid connection on challenging terrain.